Latest Revision Note

01/28/2022    REMOVED PCC (PLAIN) AND FAST TRACK ITEM NUMBERS 501-01 SERIES FROM GENERAL NOTES (G) AND (M). REVISED GENERAL NOTE (J) . REVISED GENERAL NOTES (L) AND (M) , AND ADDED NEW ITEM NUMBERS.

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
RP-J-9CONTRACTION AND CONSTRUCTION JOINTS FOR CONCRETE PAVEMENTFOR DOWEL PLACEMENT DETAILS. SPACING IS AT 12" CENTER-TO-CENTER BETWEEN DOWELS
RP-J-15LONGITUDINAL CONTRACTION AND CONSTRUCTION JOINTSSHALL BE OMITTED BETWEEN THE NEW REPLACEMENT SLAB AND THE EXISTING SLAB
RP-J-24CONCRETE PAVEMENT SPALL AND RANDOM CRACK REPAIR DETAILSCROSS-REFERENCE DRAWING
RP-J-25CONCRETE PAVEMENT JOINT REPAIR DETAILSCROSS-REFERENCE DRAWING

Related Item Numbers

ITEM NO.U/MDESCRIPTION
502-03.20C.Y.FULL DEPTH PCC PAVEMENT REPAIR
502-03.21S.Y.PARTIAL DEPTH PCC PAVEMENT REPAIR
502-03.25C.Y.FULL DEPTH PCC PAVEMENT REPAIR HIGH EARLY
502-03.26S.Y.PARTIAL DEPTH PCC PAVEMENT REPAIR HIGH EARLY
502-04.01L.F.SAWING CONCRETE PAVEMENT (FULL DEPTH)
502-04.02EACHLOAD TRANSFER DOWELS
502-04.03EACHTRANSVERSE DOWEL BARS

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
07-17-1984 | 04-02-1990 | 12-18-1994 | 05-27-1996 | 07-29-1996 | 05-27-2001 | 01-19-2002 | 10-26-2004 | 01-24-2012 | 07-25-2012 | 05-01-2020 | 01-28-2022
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM