TDOT Construction Lane Closure Report for Middle Tennessee, December 12-18, 2019
DAVIDSON COUNTY, Interstate 440 Reconstruction
· Daily, 9AM-3PM, There will be a right lane closure on SR 6 (Franklin Pike southbound) at LM 5.5 for bridge work. There will be intermittent lane closures on Charlotte Pike under I-440 for bridge repairs.
· Nightly, 9PM-5AM, There will be lane closures and temporary ramp closures at the I-440 and I-65 interchange. There will be intermittent ramp closures at Nolensville Pike, Murphy Road, West End Avenue, Hillsboro Pike, and I-65 for ramp repair.
· From now through August 2020, I-440 will be restricted to two travel lanes in each direction from 5AM-9PM and one travel lane in each direction from 9PM-5AM.
DAVIDSON COUNTY, Interchange improvements on I-24 at Hickory Hollow Parkway
· From now through February 2020, The I-24 westbound off-ramp at Hickory Hollow will be shut down to reconstruct the ramp.
· Nightly, 8PM-5AM (excluding Friday and Saturday), There will be lane closures on I-24 eastbound between MM 60-62 for construction activities.
DAVIDSON COUNTY, Construction of Pedestrian Facilities on U.S. 70S (SR 1) from SR 251 (Old Hickory Boulevard) (LM 7.85) to Erin Lane (LM 8.30)
· Daily, 9AM-3PM, There will be a lane closure for construction work.
DAVIDSON COUNTY, Widening SR 112 (Clarksville Highway) from SR 155 to SR 12
· Daily, 9AM-3PM, There will be lane closures for clearing and grubbing.
MAURY COUNTY, Saturn Parkway Extension
· Daily, 9AM-3:30PM, There will be temporary lane closures on SR 396 for hanging overhead signs.
MAURY COUNTY, City of Columbia - West 7th Multimodal Streetscape
· Daily, 9AM-3PM, There will be lane closures from High Street to Beckett Street.
MAURY COUNTY, Widening of Duplex Road from US 31 to Secluded Lane
· Daily, 9AM-3:30PM, There will be temporary lane closures on SR 247 for road widening.
ROBERTSON and SUMNER COUNTY, S.I.A. Serving Project "Deepdish"
· Daily, 9AM-3PM, There will be temporary lane closures on SR 52 and US 31W for phase 3 construction activities. One lane will remain open.
RUTHERFORD COUNTY, The grading, drainage, construction of bridges, signals and paving on SR99 from Cason Lane (L.M. 15.97 to I-24 in Murfreesboro (L.M. 18.12)
· Daily, 9AM-4PM, There will be alternating lane closures EB and WB between the intersection of Barfield Road and the intersection of Athens Ave on SR 99 to excavate and install the new gas lines. One lane will remain open at all times.
SMITH COUNTY, Bridge Repair on SR 53 over Mulherrin Creek (LM 7.18)
· From now through April 2020, SR 53 will be reduced to one 9' lane at the bridge over Mulherrin Creek for bridge work. Traffic will be controlled by temporary signals.
SUMNER COUNTY, Resurfacing of S.R. 25 from S.R. 109 (L.M. 12.95) to Kraft Street (L.M. 15.98)
· Nightly, 8PM-6AM, There will be temporary lane closures on SR 25 in both directions for striping. One lane will remain open.
WILSON COUNTY, I-40 Widening from east of SR 109 to east of I-840
· Nightly, 8PM-5AM, There will be a lane closure in both directions for milling and paving.
WILSON COUNTY, Bridge Repair on SR 26 over Sinking Creek
· Through May 2020, SR 26 will be down to one 10' lane in each direction on the bridge over Sinking Creek. One lane will be open in each direction.
WILSON COUNTY, The repair of the bridges on US 231 (SR 10) over Town Creek (LM 13.56) in Lebanon
· From now through May 2020, US 231 (SR 10) will be down to one 11' lane in each direction for bridge work.
WILSON COUNTY, The repair of the bridges on U.S. 231 (S.R. 10) over Spring Creek (L.M. 19.48).
· From now through November 2020, US 231 (SR 10) will be down to one 11' lane in each direction for bridge work.
>>> MAINTENANCE & UTILITIES
DAVIDSON COUNTY
· Nightly, 8PM-5AM (excluding Friday and Saturday), Piedmont Natural Gas will have lane closures on I-40 at New Hope Road between exit 221 and Exit 226.
WILSON COUNTY
Wednesday, December 18 and Thursday, December 19, 8PM-5AM, Piedmont Natural Gas will have lane closures on I-40 at Exit 226.