Natural Stream Design
Revised: June 28, 2024| DRAWING | RELATED IB | REVISION DATE | DESCRIPTION |
05/01/2020
| LONGITUDINAL STONE TOE
| ||
| 05/01/2020 | BOULDER CLUSTERS
| ||
| 05/01/2020 | BOULDER CROSS VANE
| ||
| 05/01/2020 | BOULDER CROSS VANE WITH STEP
| ||
| 05/01/2020 | BOULDER W-WEIR
| ||
| 05/01/2020 | BOULDER VANES AND J-HOOK
| ||
| 11/30/2020 | LOG VANES, ROOT WADS, AND BOULDER J-HOOK
| ||
| 11/30/2020 | LOG AND BOULDER STEP POOLS | ||
| 05/01/2020 | BOULDER RIFFLES
| ||
| 11/30/2020 | LOG RIFFLES
| ||
| 05/01/2020 | CONSTRUCTED ALLUVIAL RIFFLE
| ||
| 05/01/2020 | SUBSTRATE RESTORATION
| ||
| 05/01/2020 | CLAY CHANNEL PLUG
| ||
| D-NSD-32 | 05/01/2020 | WOOD TOE WITH GEO-LIFTS | |
| D-NSD-32A | 05/01/2020 | BOULDER TOE WITH GEO-LIFTS | |
| D-NSD-33 | 05/01/2020 | COIR FIBER EROSION CONTROL BLANKET AND COIR FIBER ROLLS | |
| D-NSD-34 | 05/01/2020 | LIVE STAKES AND LIVE SILTATION | |
| D-NSD-35 | 05/01/2020 | LIVE FASCINES | |
| D-NSD-36 | 05/01/2020 | BRUSH MATTRESS | |
| D-NSD-37 | 05/01/2020 | SPECIAL NOTES FOR NATURAL STREAM DESIGN | |
If you find any mistakes, missing information or have a question, contact:
TDOT Engineering Production Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.EngineeringProductionSupport@tn.gov
This Page Last Updated: June 28, 2024 at 4:38 PM