Roadway, Pavement Appurtenances, and Fences
Revised: July 31, 2024| DRAWING | RELATED IB | REVISION DATE | DESCRIPTION |
05/01/2020
| CONCRETE SHOULDER RUMBLE STRIP DETAIL (FOR 4-LANE DIVIDED HIGHWAY)
| ||
| 05/01/2020 | CONCRETE SHOULDER RUMBLE STRIP DETAIL (FOR 6-LANE OR WIDER DIVIDED HIGHWAY)
| ||
| RP-CS-3 | IB 23-11 | CONCRETE SHOULDER MILLED RUMBLE STRIP DETAILS | |
05/01/2020
| PORTLAND CEMENT CONCRETE PAVEMENT JOINT TYPES AND SPACING
| ||
| 05/01/2020 | PORTLAND CEMENT CONCRETE PAVEMENT JOINT TYPES AND SPACING
| ||
05/01/2020
| TYPICAL ACCELERATION AND DECELERATION LANE JOINT TYPES AND SPACING FOR CONCRETE RAMPS
| ||
05/01/2020
| CONCRETE RAMP JOINT TYPES AND SPACING
| ||
05/01/2020
| CONTRACTION AND CONSTRUCTION JOINTS FOR CONCRETE PAVEMENT
| ||
05/01/2020
| 3/4" AND 1 3/4" EXPANSION AND EDGE PAVEMENT JOINTS
| ||
05/01/2020
| 3/4" AND 1 3/4" ELASTOMERIC COMPRESSION JOINT SEALS
| ||
05/01/2020
| LONGITUDINAL CONTRACTION AND CONSTRUCTION JOINTS
| ||
05/01/2020
| DOWEL ASSEMBLY DEVICES | ||
01/28/2022
| DOWEL ASSEMBLY DEVICES | ||
| 05/01/2020 | DOWEL ASSEMBLY DEVICES | ||
01/28/2022
| CONCRETE PAVEMENT REPAIR DETAILS
| ||
| 05/01/2020 | CONCRETE PAVEMENT SPALL AND RANDOM CRACK REPAIR DETAILS
| ||
05/01/2020
| CONCRETE PAVEMENT JOINT REPAIR DETAILS
| ||
| RP-EPO-1 | IB 24-03 | EMERGANCY PULL OVER AREA | |
| DRAWING | RELATED IB | REVISION DATE | DESCRIPTION | |
06/15/2021
| DETAILS OF STANDARD CONCRETE DRIVEWAYS
| |||
10/29/2021
| DETAILS OF LOWERED STANDARD CONCRETE DRIVEWAYS
| |||
05/01/2020
| MEDIAN OPENINGS ON 4-LANE DIVIDED HIGHWAY
| |||
| RP-DHO-2 | 07/30/2024 | MEDIAN OPENING DETAILS FOR RESTRICTED CROSSING & J-TURN INTERSECTIONS | ||
05/01/2020
| EXAMPLES OF STREET & ALLEY INTERSECTIONS
| |||
| RP-PMR-1 | 05/01/2020 | STANDARD DETAILS FOR PROPOSED PERMANENT MAINTENANCE RAMP
| ||
10/16/2020
| STANDARD RAMP DETAILS FOR ROADWAYS AND DRIVEWAYS
| |||
| FENCES AND RIGHT-OF-WAY MARKERS | |||
|---|---|---|---|
| DRAWING | RELATED IB | REVISION DATE | DESCRIPTION |
| S-F-1 | IB 23-04 | 03/01/2023 | HIGH VISIBILITY FENCE |
| S-F-10 | 07/17/2020 | STANDARD RIGHT-OF-WAY STOCK FENCE | |
| S-F-10A | 06/28/2019 | STANDARD RIGHT-OF-WAY STOCK FENCE WITH TIMBER POSTS | |
| S-F-10B | 06/28/2019 | STANDARD RIGHT-OF-WAY CHAIN LINK FENCE | |
| S-F-10C | 06/28/2019 | RIGHT-OF-WAY FENCE AT BRIDGE AND BOX CULVERTS | |
| S-F-10D | 06/28/2019 | RIGHT-OF-WAY FENCE LOCATIONS AT INTERCHANGES | |
| S-FG-11 | 07/30/2024 | STOCK FENCE GATES AND CHAIN FENCE CLOSURE. | |
| S-FG-20 | 06/28/2019 | EXAMPLES OF WATER GATES AND WATER CROSSINGS | |
| S-RP-2 | 06/28/2019 | STANDARD CONCRETE RIGHT-OF-WAY MARKERS | |
If you find any mistakes, missing information or have a question, contact:
TDOT Engineering Production Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.EngineeringProductionSupport@tn.gov
This Page Last Updated: August 1, 2024 at 10:35 AM