EC-STR-7

SEDIMENT TRAP WITH CHECK DAM
EC-STR-7

(Click image to open PDF)

Latest Revision Note

05/04/2022    REVISED GENERAL NOTE (B) AND LENGTH OF SEDIMENT TRAP ON PROFILE VIEW. REMOVED EC-STR-55 REFERENCE FROM GENERAL NOTES (E) AND (H); REDREW SHEET.

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
EC-STR-6ROCK CHECK DAMFOR VELOCITY REDUCTION INSTALLATION DETAILS
EC-STR-6AENHANCED ROCK CHECK DAMFOR INSTALLATION DETAILS
   

Related Item Numbers

ITEM NO.U/MDESCRIPTIONREMARKS
209-05C.Y.SEDIMENT REMOVAL 
209-10.20C.Y.TEMPORARY SEDIMENT TRAP 
    

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 05-27-2001 | 09-05-2001 | 12-18-2002 | 01-22-2003 | 07-29-2004 | 04-15-2006 | 04-01-2008 | 08-01-2012 | 05-04-2022
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM